Demo sandbox 演示沙盒 — illustrative pilot data · resets periodically
Reset demo 重置
Home 首頁
KPI Matrix 指標矩陣
Compliance 合規
Readiness 準備度
Inbox 收件匣
Disclosure 披露
Scope 3 範圍三
Audit Log 審計日誌
Sign in 登入
Lineage 數據追溯 — avoided_emissions_kgco2e
avoided_emissions_kgco2e
= 4002027.6911 kgCO2e
[baseline_substitution v1]
provisional
area
·
total_output_m2
= 1032603.6874 m2
[aggregation v1]
dE = A x (9.596 - CE_unit) + ER_landfill
timber
·
output_total_m2
(timber) = 557362.7436 m2
[aggregation v1]
total_output = sum(material outputs) + MIC&Facade
GROUP
· output_area_m2 = 557362.7436 m2
source: 3.1 3 TIER CALCULATION 2026.pdf — timber block (模板產出面積), FY2025 LCA column, group total (GROUP / timber)
sum(output_area_m2) over accepted site rows
tableform
·
output_total_m2
(tableform) = 38114.6991 m2
[aggregation v1]
total_output = sum(material outputs) + MIC&Facade
GROUP
· output_area_m2 = 38114.6991 m2
source: 3.1 3 TIER CALCULATION 2026.pdf — tableform block (模板產出面積), FY2025 LCA column, group total (GROUP / tableform)
sum(output_area_m2) over accepted site rows
aluminum
·
output_total_m2
(aluminum) = 291811.6069 m2
[aggregation v1]
total_output = sum(material outputs) + MIC&Facade
GROUP
· output_area_m2 = 291811.6069 m2
source: 3.1 3 TIER CALCULATION 2026.pdf — aluminum block (模板產出面積), FY2025 LCA column, group total (GROUP / aluminum)
sum(output_area_m2) over accepted site rows
steel
·
output_total_m2
(steel) = 145314.6378 m2
[aggregation v1]
total_output = sum(material outputs) + MIC&Facade
GROUP
· output_area_m2 = 145314.6378 m2
source: 3.1 3 TIER CALCULATION 2026.pdf — steel block (模板產出面積), FY2025 LCA column, group total (GROUP / steel)
sum(output_area_m2) over accepted site rows
ce_unit
·
ce_unit_kgco2e_m2
= 5.7203 kgCO2e/m2
[allocation v1]
provisional
dE = A x (9.596 - CE_unit) + ER_landfill
ef_mat
· ef_mat_kgco2e_m2 = 34.3220 kgCO2e/m2
source: 3.1 3 TIER CALCULATION 2026.pdf — section C allocation (GROUP / na)
CE_unit = (EF_mat + CE_log_maint) / 6
ce_log_maint
· ce_log_maint_kgco2e_m2 = 0.0000 kgCO2e/m2
placeholder 佔位
source: 3.1 3 TIER CALCULATION 2026.pdf — section C — blank cell (GROUP / na)
CE_unit = (EF_mat + CE_log_maint) / 6
er_landfill
· er_landfill_kgco2e_m2 = 0.0000 kgCO2e/m2
placeholder 佔位
source: 3.1 3 TIER CALCULATION 2026.pdf — section C — blank cell (GROUP / na)
dE = A x (9.596 - CE_unit) + ER_landfill